Naval Sub Base Pier Replacement

Marine concrete has its challenges to perform in a harsh environment for a lifespan of 75 years or better. Pier 32 required a complex concrete design to prevent corrosion of the steel reinforcing, low water/cement ratio for higher strengths and a shrinkage reducing admixture to reduce the surface cracking while improving the long-term durability of the structure. The use of the SMARThatch system on a number of the concrete delivery trucks contributed greatly to controlling the QC of such a difficult concrete design.

Deck Placement Pier 32

One Reply to “Naval Sub Base Pier Replacement”

  1. Can I just say what a comfort to find somebody who truly understands what theyre talking about on the net. You certainly understand how to bring a problem to light and make it important. A lot more people really need to look at this and understand this side of the story. I cant believe youre not more popular because you definitely possess the gift.